Myanmar Electric Power Project: Invitation for Prequalification, Closing Date (24 Feb, 2014)

Invitation for Prequalification
Myanmar Electric Power Project (IDA-53060-MM)
Thaton Combine Cycle Gas Turbine (CCGT)
Power Plant

This invitation for prequalification follows the general procurement notice for this project that appeared in Development Business of October 22, 2013 on-line. The Republic of the Union of Myanmar has received a credit from the International Development Association (IDA) toward the cost of the Myanmar Electric Power Project, and it intends to apply part of the proceeds of this credit to payments under the contract for Thaton Combine Cycle Gas Turbine (CCGT) Power Plant at the existing Thaton gas station (GT) in Mon State with a new combined cycle gas turbine (CCGT) power plant. The Myanmar Electric Power Enterprise (MEPE) intends to prequalify contractors for supply and installation of a gas power plant which will generate and supply as much electricity as possible to the grid, limited by the available fuel gas up to 25MM CGD. Power export shall be at 66kV and 230 kV. The power station shall primarily generate base load power to Myanmar National grids. The main specifications include: the overall capacity of the power plant to be constructed is in the range of 105-110 MW, the minimum capacity of gas turbine and steam turbine is 35-45MW/unit and 20-40 MW/unit respectively.

It is expected that invitations for bid will be made in April 2014. Prequalification will be conducted through the procedures specified in the World Bank’s Guidelines: Procurement under IBRD loans and IDA Credits, January 2011, and is open to all bidders from eligible source countries, as defined in the guidelines.

Interested eligible Applicants may obtain further information from and inspect the prequalification document from 10:00 – 15:30 hrs.

Thermal Power Department
Myanmar Electric Power Enterprise,
Bldg No.27, Nay Pyi Taw
Phone: +9567410228

A complete set of the prequalification in English language may be obtained free of charge by sending a request to the above email address. A copy of the prequalification document will be sent to the interested eligible Applicants as the attachment to the email. Application for prequalification should be submitted in sealed envelopes, delivered to the address below by 24.2.2014, 14:00 Hr. and be clearly marked “Application to Prequalify for Thaton Combine Cycle Gas Turbine (CCGT) Power Plant (ICB MEPE-G-o1)”

Material Planning Department
Myanmar Electric Power Enterprise,
Ministry of Electric Power
Bldg No. 27, Nay Pyi Taw

Source: Ministry of Electric Power

NB: The best way to find information on this website is to key in your search terms into the Search Box in the top right corner of this web page. E.g. of search terms would be “property research report”, ”condominium law”, "Dagon City", “MOGE”, “yangon stock exchange”,"MECTEL", "hydropower", etc.

To learn about the business opportunities in Myanmar click here

To evaluate the various segments of the market that you could possibly enter base on your competencies you can do a Custom Market Entry Strategy Research. You can see a sample report at page "Actual Sample of Client Report”. Click here to go to page.

Do you know that IE Singapore is giving up to SGD 20,000 support for Singapore company to venture into Myanmar? To learn more click here