fbpx

IFP No. PQ-ICB-01 Invitation for Prequalification Greater Yangon Water Supply Improvement Project, Closing Date 20 July 2016



Date: May 17, 2016

Loan Agreement No.: MY-P5

IFP No.: PQ-ICB-01

  1. The Government of the Republic of the Union of Myanmar has received a Loan from Japan International Cooperation Agency toward the cost of the Greater Yangon Water Supply Improvement Project. It is intended that part of the proceeds of this Loan will be applied to eligible payments under the contract resulting from the bidding for which this prequalification is conducted.
  2. The Head of Department, Engineering Department (Water and Sanitation), Yangon City Development Committee intends to prequalify contractors and/or firms for:

– The construction of an administration building at the Lagunbyin Water Treatment Plant including the procurement and installation of laboratory equipment.

– The procurement and installation of a SCADA system including sensors for the Lagunbyin WTP and the transmission and distribution system.

– Construction of disinfection facilities at 4 locations.

– The construction of a treated water transmission pumping station at the Lagunbyin Water Treatment Plant (7,900 m3/hr) including the procurement and installation of pumps.

– The construction of two reinforced concrete service reservoirs: SR7=21,000 m3 and SR8=28,000 m3.

– The construction of a distribution pumping station at SR7 including procurement and installation of distribution pumps (5,280 m3/hr)

– The construction of a distribution and transmission pumping station at SR8 including procurement and installation of distribution pumps (5,280 m3/hr) and transmission pumps to serve the Thilawa SEZ (1,750 m3/hr).

  1. It is expected that Invitation for Bids will be made in October 2016.
  2. Prequalification will be conducted through procedures in accordance with the applicable Guidelines for Procurement under Japanese ODA Loans, and is open to all Applicants from eligible source countries, as defined in the Loan Agreement.
  3. Interested eligible Applicants may obtain further information from and inspect the Prequalification Documents at the office of Head of Department, Engineering Department (Water and Sanitation), Yangon City Development Committee from 9:30 a.m. to 4:30 p.m.
  4. A complete set of the Prequalification Documents may be purchased by interested Applicant(s) from 17 May to 31 May 2016 on the submission of a written Application to the address below and upon payment of a non-refundable fee of MMK 15,000.
  5. Applications for prequalification should be submitted in sealed envelopes, delivered to the address below by 12:00 noon – July 12, 2016, and be clearly marked “Application to Prequalify for Greater Yangon Water Supply Improvement Project Contract Package No.ICB-01”

Head of Department

Engineering Department (Water and Sanitation)

Yangon City Development Committee

Mr. Myint Oo

No.390, 12- Storey New Building, Merchant Road, Botahtaung Township, Yangon, Myanmar

+95-977-8940593

+95-977-8940595

ycdcws@gmail.com

NB: The best way to find information on this website is to key in your search terms into the Search Box in the top right corner of this web page. E.g. of search terms would be “property research report”, ”condominium law”, “Puma Energy”, “MOGE”, “yangon new town”,”MECTEL”, “hydropower”, etc.

.

Looking for foreign investors to invest in your business in Myanmar