fbpx

Invitation for Prequalification, Yangon Water Supply Improvement Project, Deadline: 15 July, 2019

The Government of the Republic of the Union of Myanmar

Yangon City Development Committee

Invitation for Prequalification

Greater Yangon Water Supply Improvement Project Phase 2

Date: 31 May 2019

Loan Agreement No: MY-P19

IFP No: MY-P19/PQ-04

  1. The Government of the Republic of the Union of Myanmar has received a Loan from Japan International Cooperation Agency toward the cost of the Greater Yangon Water Supply Improvement Project Phase 2. It is intended that part of the proceeds of this Loan will be applied to eligible payments under the contract resulting from the bidding for which this prequalification is conducted.
  2. The Yangon City Development Committee intends to prequalify contractors and/ or firms for Renovation of Kokkine Service Reservoir and Construction of Distribution Networks in Zone 1 (Low Subzone).

– Renovation of the existing Kokkine Service Reservoir having its design capacity of 20MG (90,920m3)

– Construction of distribution main pipe of Ductile Iron Pipe (DIP, DN450- 1500mm) with total length of approx. 21.0km, including pipe jacking for railway crossing (DN800mm x L=70.0m, DN1500mm x L=88.0m)

– Construction distribution network of HDPE pipe (OD110-630mm) with total length of approx. 250.0 km

– Replacement and new installation of house connections and water meters, with total number of 113,900 connections (including both existing and new connections)

  1. It is expected that Invitation for Bids will be made in September 2019.
  2. Prequalification will be conducted through procedures in accordance with the applicable Guidelines for Procurement under Japanese ODA Loans, and is open to all Applicants from eligible source countries, as defined in the Loan Agreement.
  3. Interested eligible Applicants may obtain further information from and inspect the Prequalification Documents at the office of Head of Department, Engineering Department (Water and Sanitation), Yangon City Development Committee from 9:30am to 4:30pm.
  4. A complete set of the Prequalification Documents may be purchased by interested Applicant(s) on the submission of a written Application to the address above and upon payment of a nonrefundable fee of MMK20,000 (Twenty thousand Myanmar Kyat).
  5. Applications for prequalification should be submitted in sealed envelopes, delivered to the address above by 15 July 2019, and be clearly marked “Application to Prequalify for Package No. ICB-04 Renovation of Kokkine Service Reservoir and Construction of Distribution Networks in Zone 1 (Low Subzone) under the Greater Yangon Water Supply Improvement Project Phase 2.”

U Myint Zaw Than,
Head of Department, Engineering Department (Water and Sanitation),
Yangon City Development Committee
No. 390, 12-Storey New Building, Merchant Road, Botahtaung Township, Yangon, Myanmar
e-mail: kokkowa5@gmail.com

Source: Tender Committee

NB: The best way to find information on this website is to key in your search terms into the Search Box in the top right corner of this web page. E.g. of search terms would be “property research report”, ”condominium law”, “Puma Energy”, “MOGE”, “yangon new town”,”MECTEL”, “hydropower”, etc.

.

Looking for foreign investors to invest in your business in Myanmar