Invitation for Prequalification Greater Yangon Water Supply Improvement Project Phase 2, Deadline: 4th May 2020

The Government of the Republic of the Union of Myanmar
Yangon City Development Committee

Invitation for Prequalification
Greater Yangon Water Supply Improvement Project Phase 2

Date: 17 March 2020
Loan Agreement No: MY-P19
IFP No : MY-P19/PQ-01

1. The Government of the Republic of the Union of Myanmar has received a Loan from
Japan International Cooperation Agency toward the cost of the Greater Yangon Water
Supply Improvement Project Phase 2. It is intended that part of the proceeds of this
Loan will be applied to eligible payments under the contract resulting from the bidding
for which this prequalification is conducted.

2. The Yangon City Development Committee intends to prequalify contractors and/or
firms for Construction of Kokkowa Water Treatment Plant (60MGD).
– Construction of intake facility capable of 634,000 m3
/day (140 MGD) river water
intake including intake gate screen, sand sedimentation pond, raw water pipe and
associated facilities.
– Construction of water treatment facility of production capacity of 272,800 m3/day
(60MGD) including pre sedimentation pond, lift pumping station, dividing well,
receiving well, flocculation basin, sedimentation basin, rapid sand filter, chemical
facility, sludge drying bed, clear water reservoir, transmission pumping station, yard
piping, associated facilities and landscaping. A part of water treatment facility may
be designed by the Contractor.
– Construction of operation buildings including administration building, accommodation
buildings, chemical house, generator house, warehouse, security house and associated
facilities.
– Training and O&M

3. It is expected that Invitation for Bids will be made in June 2020.

4. Prequalification will be conducted through procedures in accordance with the applicable
Guidelines for Procurement under Japanese ODA Loans, and is open to all Applicants
from eligible source countries, as defined in the Loan Agreement.

5. Interested eligible Applicants may obtain further information from and inspect the
Prequalification Documents at the office of Head of Department, Engineering Department
(Water and Sanitation), Yangon City Development Committee from 9:30am to 4:30pm.

6. A complete set of the Prequalification Documents may be purchased by interested
Applicant(s) on the submission of a written Application to the address above and upon
payment of a nonrefundable fee of MMK20,000 (Twenty thousand Myanmar Kyat).
Payment shall be only by cash.

7. Applications for prequalification should be submitted in sealed envelopes, delivered
to the address above by 4 May 2020, and be clearly marked “Application to Prequalify
for Package No. ICB-01 Construction of Kokkowa Water Treatment Plant (60MGD)
under the Greater Yangon Water Supply Improvement Project Phase 2.”
U Myint Zaw Than,
Head of Department, Engineering Department (Water and Sanitation),
Yangon City Development Committee
No. 390, 12-Storey New Building, Merchant Road, Botahtaung Township, Yangon, Myanmar
e-mail: kokkowa5@gmail.com

Source: Yangon City Development Committee