fbpx

Invitation for Bids : Engineering, Procurement and Construction for Power Generation Facility ; Deadline : 28th May 2020

Invitation for Prequalification – Engineering, Procurement and
Construction for Power Generation Facility of
Integrated LNG to Power Project in Mee Lin Gyaing,
The Republic of The Union of Myanmar

1. Entrusted by Mee Lin Gyaing Electric Power Co. Ltd, Union Resources
& Engineering Company Limited (UREC) now invites Applications for
Prequalification for Engineering, Procurement and Construction for Power
Generation Facility of Integrated LNG to Power Project in Mee Lin Gyaing,
The Republic of The Union of Myanmar.

2. Prequalification will be conducted through the procedures in accordance with
the applicable international practice for selection of the contractor on EPC basis.

3. Only eligible Applicants within the last ten (10) years with the following key
qualifications should participate in the Prequalification:
• Contracted amount involving gas turbine generator units not less than
US$300 million, and
• At least four gas turbines equivalent to or higher than 9F family of gas
turbines that have been successfully put into commercial operation, as the
contractors for design and installation or on turnkey basis, or
• At least one gas turbine generator unit with the installed capacity equal to
or higher than 300MW that has been put into operation, as the contractor on
EPC basis.
The prequalification criteria are more completely described in the
Prequalification Documents.

4. Please visit website www.urec.com.cn for details of the Integrated LNG to
Power Project in Mee Lin Gyaing in The Republic of The Union of Myanmar
and the Prequalification Documents.

5. A complete set of Prequalification Documents may be obtained free of charge by
interested eligible applicants upon the submission of a written application to the
Email Address: urec-mlg@urec.com.cn from 8:00, May 21st to 16:00 May 24th,
2020 (local time). The Prequalification Documents will be issued through email
only.

6. Applications for prequalification should be submitted in sealed envelopes before
16:00 28th May, 2020.
7. Refer to the Prequalification Documents for details of the requirements for the
Preparation and Submission of Applications for Prequalification together with Security.

Source : Union Resources & Engineering Company Limited

 

NB: The best way to find information on this website is to key in your search terms into the Search Box in the top right corner of this web page. E.g. of search terms would be “property research report”, ”condominium law”, “Puma Energy”, “MOGE”, “yangon new town”,”MECTEL”, “hydropower”, etc.

.

Looking for foreign investors to invest in your business in Myanmar