fbpx

Invitation for Prequalification – Myanmar Power System Efficiency and Resilience Project ; Deadline : 20 August 2020

Invitation for Prequalification
Country: Republic of the Union of Myanmar
Name of Project: Myanmar Power System Efficiency and
Resilience Project
Contract Title: Design, Supply, Installation, Testing and
Commissioning of a Combined Cycle Gas Turbine (CCGT)
Power Plant of around 300MW Net Power Capacity
Sector: Energy
Prequalification Reference No.: EPGE-PQ-01/2020
Date: June 11, 2020

1. The Government of Myanmar has applied for financing from
the World Bank toward the cost of the Ywama new Combined
Cycle Gas Turbine (CCGT) power plant and intends to apply
part of the proceeds toward payments under the contract for
Design, Supply, and Installation of a CCGT Power Plant of
around 300MW Net Power Capacity.

2. Electric Power Generation Enterprise (EPGE) under the
Ministry of Electricity and Energy (MOEE) intends to prequalify
contractors for performance of the construction of a power plant
at the Ywama site, located in the suburb of Yangon. The plant will
be built using the combined cycle gas technology and the scope of
works is for a full turn-key power plant; including the demolition
of existing units, engineering, procurement, construction and
installation of equipment, testing, and commissioning of the
new power plant. The time for completion of the facilities is
estimated to be of 36 months. The detailed scope of the contract
is outlined in Section VII of this Prequalification Document. It
is expected that the Request for Bids will be made in 2020.

3. Prequalification will be conducted through the procedures as
specified in the World Bank’s Procurement Regulations for
IPF Borrowers July 2016, revised November 2017 and August
2018 (“Procurement Regulations”), and is open to all eligible
Applicants as defined in the Procurement Regulations.

4. Interested eligible Applicants may obtain further information
from EPGE at the address below during office hours 09.30
to 16.30 hr (Myanmar Standard Time). A complete set of
the prequalification document in English language can be
available by interested Applicants on the submission of a written
application to the address below by email from the date of
announcement. The document will be sent by e-mail.

5. Applications for prequalification should be submitted in sealed
envelopes delivered to the address below by August 20, 2020,
14:00 hr Myanmar Standard Time and be clearly marked
“Application to Prequalify for Ywama New Combine Cycle
Gas Turbine (CCGT) Power Plant(ICB EPGE-PQ-01/2020)”
Late applications may be rejected by Electric Power Generation
Enterprise (EPGE) under the Ministry of Electricity and Energy (MOEE).

Attn: Managing Director
Office No.27, Nay Pyi Taw, the Republic of the Union of Myanmar
Phone: +95 9 2225181, +95 9 5133511
E-mail: ywamaproject@gmail.com

Source : Ministry of Electricity and Energy

NB: The best way to find information on this website is to key in your search terms into the Search Box in the top right corner of this web page. E.g. of search terms would be “property research report”, ”condominium law”, “Puma Energy”, “MOGE”, “yangon new town”,”MECTEL”, “hydropower”, etc.

.

Looking for foreign investors to invest in your business in Myanmar