Invitation for Prequalification – Engineering, Procurement and Construction for Overhead Power Transmission lines and Substation Extensions of Integrated LNG to Power Plant in Mee Lin Gyaing : Deadline : 29th July 2020

Invitation for Prequalification – Engineering, Procurement and Construction for
Overhead Power Transmission lines and Substation Extensions of Integrated LNG
to Power Plant in Mee Lin Gyaing, the Republic of the Union of Myanmar

1. Entrusted by Mee Lin Gyaing Electric Power Co. Ltd, Union Resources & Engineering Company
Limited (UREC) now invites Applications for Prequalification for Engineering, Procurement and
Construction of Overhead Power Transmission Lines and Substation Extensions for Integrated
LNG to Power Plant in Mee Lin Gyaing, the Republic of the Union of Myanmar.

2. Scopes of Works
2.1 Package 1
• 500kV double-circuit overhead power transmission line from newly-built power plant to 500kV
West University Substation with a length of 206km approximately, proposed conductor crosssection of 4×630mm2 and overcrossing Ayeyarwady River for one time at span of about 1.35km;
• Extension of two bays in 500kV West University Substation near Yangon, including one 500MVA
main transformer and five circuit breakers;
• Extension of four bays in 230kV Pathein Substation;
• Extension of two bays in 230kV Athoke Substation.
2.2 Package 2
• 230kV double-circuit overhead power transmission line from newly-built power plant to Pathein
Substation with a length of 69km approximately and proposed conductor cross-section of
2×400mm2;
• 230kV double-circuit overhead power transmission line from Pathein Substation to Athoke
Substation with a length of 55km approximately and proposed conductor cross-section of
2×400mm2.

3. Only eligible Applicants with the following key qualifications should participate in the prequalifying
process:3.1 For Package 1 The applicants or their subcontracted installation entity and design institute should:
• possess integrated construction qualification class A for power sector or particular construction
qualification class A for power transformation and transmission, and integrated design qualification
class A for power sector;
• as designer, installer or EPC contractor in the past five years:
– complete 500kV or higher voltage overhead power transmission line length not less than
400km (equivalent to single-circuit length accumulated in several projects) in China;
– complete 230kV or higher voltage overhead power transmission line length not less than
100km (equivalent to single-circuit length accumulated in several projects) outside China;
– complete at least one 500kV or higher voltage overhead power transmission line with large
span (not less than 1km) for overcrossing obstruction in China or 230kV or higher voltage
overhead power transmission line with large span (not less than 1km) for overcrossing
obstruction outside China;
– complete at least four 500kV or higher voltage substations in China or at least two 230kV or
higher voltage substations outside China.
3.2 For Package 2
• possess integrated construction qualification class A for power sector or particular construction
qualification class A for power transformation and transmission, and integrated design qualification
class A for power sector;
• as designer, installer or EPC contractor in the past five years:
– complete 230kV or higher voltage overhead power transmission line length not less than
500km (equivalent to single-circuit length accumulated in several projects) in China;
– Complete 230kV or higher voltage overhead power transmission line length not less than
100km (equivalent to single-circuit length accumulated in several projects) outside China.

4. Applicants with the completed similar projects in Myanmar will be preferred.

5. A complete set of Prequalification Documents in Chinese may be obtained free of charge by
interested eligible applicants upon the submission of a written application together with the
appendixes to demonstrate the qualifications and experiences as well as the certificate of legal
representative or the power of attorney of legal representative, and the effective identity certificate
of legal representative or authorized representative to the Email Address: tushangsong@urec.com.
cn; cc: urec-mlg@urec.com.cn.from 8:00, July 8th to 16:00 July 13th, 2020 (local time).

6. Upon receipt of the specified application and appendixes, UREC will send the Prequalification
Documents in electronic version to the email address given by the qualified applicant.

7. The Applications for Prequalification should be submitted in the sealed envelopes before 16:00
July 29th, 2020(local time).

8. Refer to the Prequalification Documents for details of the requirements for Preparation and
Submission of Applications for Prequalification together with Security